Recently, the head of the Engineering Machinery Division led engineers to Leshan to complete the regeneration of the ion exchange mixed bed in a pure water system.
Upon arrival, they immediately began their intensive work. The regeneration of the ion exchange mixed bed involves two main steps: first, the preparation of the chemical solution, and then the regeneration itself. The preparation of the chemical solution must be flawless; even the slightest error could have serious consequences. The regeneration process involves nine interconnected steps, much like the close cooperation between engineers. Poor coordination renders all previous work futile. After a day and a night of continuous effort and teamwork, they successfully completed the regeneration of the ion exchange mixed bed.